Procurement process

Ten steps. Every category. Every engagement.

Our protocol does not change because a category is small or a client is new. It changes only in depth. This is the sequence, what it produces, and why each step exists.

The protocol

Requirement to delivery

Procurement failures are process failures. The protocol is fixed and sequential, so finance, audit, and legal inherit a file they can defend.

01

Requirements analysis

We convert an operational need into a procurement-grade specification: technical parameters, volumes, tolerances, certifications, packaging, delivery windows, and total-cost constraints. Ambiguity here is the single largest driver of failure downstream.

Output
  • Requirement specification & category brief
02

Supplier identification

We build a long list from our qualified network and targeted market research across the relevant sourcing regions, screening for capability fit, capacity headroom, and commercial viability.

Output
  • Supplier long list with market map
03

Vendor qualification

Long list becomes short list. We verify legal standing, financial stability, certifications, quality systems, references, and production capability — including on-site audit where the category warrants it.

Output
  • Qualified short list & risk profile
04

RFQ / RFP development

We issue a controlled bid package with a uniform scope, commercial template, and evaluation criteria so every response is comparable on the same basis. Uniformity is what makes competition real.

Output
  • Issued RFQ or RFP package
05

Supplier evaluation

Bids are normalised to landed cost and tabulated against weighted criteria: price, capability, capacity, lead time, quality systems, compliance, and continuity risk.

Output
  • Bid tabulation & weighted scorecard
06

Negotiation

We negotiate unit price, tiered volume pricing, payment terms, tooling and setup costs, warranty, lead time commitments, and price-hold periods — with credible alternatives held live in reserve.

Output
  • Negotiated commercial position
07

Purchase order creation

The agreed position is committed to a controlled purchase order or supply agreement with defined specifications, acceptance criteria, Incoterms, milestones, and remedies.

Output
  • Executed PO or supply agreement
08

Quality assurance

We define the inspection regime before production starts: pre-production samples, in-process checks, pre-shipment inspection, and documented acceptance criteria with third-party inspection where required.

Output
  • Inspection protocol & release documentation
09

Logistics coordination

We coordinate freight mode, consolidation, customs documentation, duty classification, and delivery sequencing with forwarding and customs partners against the committed delivery window.

Output
  • Shipment plan & documentation set
10

Delivery management

We manage receipt, discrepancy resolution, claims, and supplier performance scoring — then feed the result back into category strategy for the next cycle.

Output
  • Delivery confirmation & supplier scorecard
Governance

What you receive at every stage

Each step produces an artifact. Together they form the engagement file — a complete, auditable record of how a decision was made and what was committed. Clients retain full ownership of this documentation.

StepStageDeliverable
01Requirements analysisRequirement specification & category brief
02Supplier identificationSupplier long list with market map
03Vendor qualificationQualified short list & risk profile
04RFQ / RFP developmentIssued RFQ or RFP package
05Supplier evaluationBid tabulation & weighted scorecard
06NegotiationNegotiated commercial position
07Purchase order creationExecuted PO or supply agreement
08Quality assuranceInspection protocol & release documentation
09Logistics coordinationShipment plan & documentation set
10Delivery managementDelivery confirmation & supplier scorecard
Engagement timelines

How long procurement actually takes

Timelines are category-dependent and specification-dependent. The ranges below are planning guidance for scoping, not commitments — a firm schedule is issued with the sourcing approach once the requirement is defined.

Category typePlanning guidance
Catalogue and stocked commodity itemsRequirement to quotation in days. Delivery governed by supplier stock position and freight mode.
Standard manufactured goods, domestic sourceRequirement to award in weeks. Delivery governed by production slot and lead time.
Standard manufactured goods, international sourceRequirement to award in weeks; delivery extended by production, inspection, ocean or air transit, and customs clearance.
Custom, tooled, or engineered productsExtended timeline driven by sampling and tooling cycles. Pre-production approval gates are mandatory before volume release.
Multi-category site openings and fit-outsRun as a programme with a critical-path schedule, sequenced awards, and consolidated delivery to a committed opening date.
Enterprise category programmesStructured as a phased engagement: spend assessment, category strategy, competitive event, transition, and ongoing governance.
Start here

Run one category through the protocol.

The fastest way to evaluate a procurement partner is to give them a live requirement.